The Six Sigma methodology is used to get the quality level at the highest level. It is discipline and data driven approach to minimize defects in a production process. With the Six Sigma failure level as goal 3.4 defects Parts Per Million (PPM). The 3.4 PPM is 4.5 Sigma Long term and considered 6 Sigma Short term.